Other Work

Phase 8: “Las Lagunas” controlled landfill for hazardous waste in Zalla

The controlled landfill is located in the town of Zalla (Bizkaia), in the area called “Las Lagunas”. Its exploitation plan… [+ info]

Health and safety study for the phase 2 pc in the controlled landfill of Mutiloa (Guipuzkoa)

The work consists of the closure of Phase 2 of the controlled landfill for Non-Hazardous Waste from Mutiloa. This includes… [+ info]

Construction project “for phase 4 of the controlled landfill in Larrabetzu (Bizkaia)”

The Controlled Landfill of Larrabetzu has Environmental Authorization AAI00145/1 from April of 2008. The area authorised for the management of… [+ info]

Project for boat anchorage in Sukarrieta

The project analyses various alternative management formulas and undertakes one of them, globally better in environmental, economic and rationalization of… [+ info]